The Hills race to finish installing their floor in order to avoid delaying their scheduled wall delivery, which leads to an injury on site. Jackie and her team work through the rain to get as many layered walls done as possible to make up for lost time the week before, but they run into problems when their build materials start to fall apart. At the Owen's build site, the team struggles to install the loft floor joists and tongue and groove flooring before a snowstorm could bury them.
—Luke Austin